TUNG LEE
At Tung Lee, we recognize the paramount importance of upholding the highest quality standards in all our endeavors. With our expertise and meticulous craftsmanship, we consistently deliver enduring solutions that meet the needs of numerous satisfied clients.
LICENCES & ACCREDITATION
Lists of Public Works Contractors
- Group B (Probation) in Roads and Drainage
- Group B (Probation) in Site Formation
REGISTER OF SUBCONTRACTORS
- Sheet piles
- Earthwork
- Roadworks
- Road drainage and sewer
ISO 9001 Certification
OUR SERVICES
What’s Provided
SITE FORMATION
At Tung Lee, we take pride in our ability to deliver top-notch site formation services, bolstered by our ownership of state-of-the-art equipment and plant. With a diverse and modern fleet at our disposal, we ensure efficient and precise execution of projects, regardless of size or complexity. Our investment in cutting-edge machinery not only enhances productivity but also underscores our commitment to delivering high-quality results on time and within budget. Trust Tung Lee for your site formation needs, where advanced equipment meets unparalleled expertise for optimal project outcomes.
ROADS AND DRAINAGE
Tung Lee specializes in comprehensive road and drainage services, encompassing a wide array of projects including bridge work, tunnel construction, and more. With a proven track record of delivering successful infrastructure solutions, we bring together expertise, innovation, and dedication to ensure the seamless completion of every project. From designing and constructing roads to implementing drainage systems and intricate bridge structures, our team leverages years of experience and cutting-edge technology to meet the diverse needs of our clients. Trust Tung Lee to deliver exceptional results in road and drainage services, providing reliable infrastructure that stands the test of time.
ONGOING PROJECT
A Few Highlights
YL/2021/03 - SITE FORMATION AND INFRASTRUCTURE WORKS FOR YUEN LONG SOUTH FIRST PHASE DEVELOPMENT - CONTRACT 1
August 2022
The works mainly include:
site clearance and formation (including land decontamination works) for about five hectares of land, together with the provision of associated engineering infrastructure;
construction of a single two-lane carriageway of about 130 metres long connecting to Lam Tai West Road;
construction of a single two-lane carriageway of about 130 metres long connecting to Long Hon Road;
construction of associated works including footpaths, slopes, retaining wall, landscaping works, water supply system, sewerage system and drainage system; and
implementation of environmental mitigation measures for the works mentioned above.
IS/2022/01 IMPROVEMENT WORKS AT TAI O - PHASE 2 STAGE 2
March 2023
i. Construction of footbridges at Po Chue Tam and Yim Tin;
ii. Upgrading works of the open area in front of Yeung Hau Temple;
iii. Construction of an amphitheatre-cum-open space and a public car park at Yim Tin; and
iv. Ancillary works, including associated road, drainage, water mains, sewerage, utilities, landscaping and public lighting works, etc.
CV/2023/06 SITE FORMATION WORKS AT KWOK SHUI ROAD, TSUEN WAN
May 2023
The works mainly include site formation works of about 1.4 hectares at Kwok Shui Road, Tsuen Wan.
PLANTS AND EQUIPMENT
Our self-owned extensive collection of plants and top-of-the-line equipment enables us to stay competitive and effectively cater to the diverse needs of our clients. Committed to satisfaction, we prioritize delivering high-quality service that exceeds expectations. At Tung Lee, our dedication to owning and maintaining our resources ensures reliability, efficiency, and unparalleled customer satisfaction.