top of page
Untitled

At Tung Lee, we recognize the paramount importance of upholding the highest quality standards in all our endeavors. With our expertise and meticulous craftsmanship, we consistently deliver enduring solutions that meet the needs of numerous satisfied clients.

HOME: ABOUT US

LICENCES & ACCREDITATION

Lists of Public Works Contractors
- Group B (Probation) in Roads and Drainage 
- Group B (Probation) in Site Formation

ISO 9001 Certification 

HOME: About

Our Services

What’s Provided

Untitled
Untitled

SITE FORMATION

At Tung Lee, we take pride in our ability to deliver top-notch site formation services, bolstered by our ownership of state-of-the-art equipment and plant. With a diverse and modern fleet at our disposal, we ensure efficient and precise execution of projects, regardless of size or complexity. Our investment in cutting-edge machinery not only enhances productivity but also underscores our commitment to delivering high-quality results on time and within budget. Trust Tung Lee for your site formation needs, where advanced equipment meets unparalleled expertise for optimal project outcomes.

ROADS AND DRAINAGE

Tung Lee specializes in comprehensive road and drainage services, encompassing a wide array of projects including bridge work, tunnel construction, and more. With a proven track record of delivering successful infrastructure solutions, we bring together expertise, innovation, and dedication to ensure the seamless completion of every project. From designing and constructing roads to implementing drainage systems and intricate bridge structures, our team leverages years of experience and cutting-edge technology to meet the diverse needs of our clients.

HOME: SERVICES

ONGOING PROJECT

YL/2021/03

Site Formation and Infrastructure Works for Yuen Long South First Phase Development - Contract 1

​

Client: Civil Engineering and Development Department

Contractor: Tung Lee Civil Engineering Limited

Contract Award Date: 23 August 2022

Contract Sum: HK$167M

​

The works mainly include:

  • Site clearance and formation (including land decontamination works) for about five hectares of land, together with the provision of associated engineering infrastructure;

  • Construction of a single two-lane carriageway of about 130 metres long connecting to Lam Tai West Road;

  • Construction of a single two-lane carriageway of about 130 metres long connecting to Long Hon Road;

  • Construction of associated works including footpaths, slopes, retaining wall, landscaping works, water supply system, sewerage system and drainage system;

  • Implementation of environmental mitigation measures for the works mentioned above.

IS/2022/01

Improvement works at Tai O -Phase 2 Stage 2

​

Client: Civil Engineering and Development Department

​

​

Contractor: Tung Lee - CCCC- FHDI  Joint Venture

Contract Award Date: 22 March 2023
Contract Sum: HK$282M

The works mainly include:

  • Construction of footbridges at Po Chue Tam and Yim Tin;

  • Upgrading works of the open area in front of Yeung Hau Temple; 

  • Construction of an amphitheatre-cum-open space and a public car park at Yim Tin;

  • Ancillary works, including associated road, drainage, water mains, sewerage, utilities, landscaping and public lighting works.

CV/2023/06

Site Formation Works at Kwok Shui Road, Tsuen Wan 

​

Client: Civil Engineering and Development Department

Contractor: Tung Lee - CCCC- FHDI  Joint Venture

Contract Award Date: 12 May 2023

Contract Sum: HK$47M

The works mainly include:

Site formation works of about 1.4 hectares at Kwok Shui Road, Tsuen Wan.

CV/2023/17

Site Formation and Infrastructure Works at Tsing Yi Road West

​

​Civil Engineering and Development Department

Contractor: Build King – Tung Lee Joint Venture

Contract Award Date: 19 July 2024

Contract Sum: HKD$578M

The works mainly include:

  • Site formation works and construction of associated retaining walls and slopes;

  • Construction of a footbridge across Tsing Yi Road West and associated lift facilities;

  • Construction of signalised junction at Tsing Yi Road West near Ching Hong Road; and

  • Ancillary works including drainage, sewerage, waterworks and landscaping works.

HY/2023/08
Central Kowloon Route - Remaining Works
Client: Highways Department

Contractor: Build King – Tung Lee Joint Venture

Contract Award Date: 15 July 2024 

Contract Sum: HKD$829M


​

​

The works mainly include:

  • Design and construction of landscaping works at Yau Ma Tei Landscaped Deck, Yau Ma Tei Rest Gardens, North Tree Park and Kai Tak Phase 2B Landscaped Deck;

  • Improvement of a section of Kai Fuk Road of approximately 300m in length;

  • Planting of compensatory trees; Associated civil works, electrical and mechanical works, road and drainage works, lighting works and establishment works.

HOME: ONGOING PROJECT
HOME: PLANTS & EQUIPMENT

Plants and Equipment

Our self-owned extensive collection of plants and top-of-the-line equipment enables us to stay competitive and effectively cater to the diverse needs of our clients. Committed to satisfaction, we prioritize delivering high-quality service that exceeds expectations. At Tung Lee, our dedication to owning and maintaining our resources ensures reliability, efficiency, and unparalleled customer satisfaction.

Untitled
Untitled

3  ~ 80 Tons Excavator

3 ~ 20 Tons Compaction Roller 

Untitled
Untitled

30 & 38 Tons Dump Truck

Hydraulic Drill Rig

Send your curriculum vitae to us by email

Senior Civil Engineer

Project Civil Engineer

Graduate Engineer

Project Quantity Surveyor 

Safety Officer

Environmental Officer

Click below link to apply

HOME: RECRUITMENT

Room 1711, Tuen Mun Central Square, 22 Hoi Wing Road, Tuen Mun, NT, Hong Kong

Tel: +852 2802 1288

Fax: +852 2352 6740

©2024 by Tung Lee.

bottom of page